fri 27.12.24
2 mins read ·
- Status: 0 (todo), 1 (done), 2 (cont).
id activity status link info 00 Create this daily note 1 24l34 below 01 Archive comm munir ag res 1 24l05 below 02 List planned rust new features 1 24l35 below 03 Create repo for cs-q-comp on OSF 1 24l33 below 04 Trace back the shared drives 1 24l36 below 05 Frühstück zusammen 1 - below 06 Lazumar Unri treffen 1 - below 07 Report returning budget + WP4.1 progress 1 24l06 below 08 Info drive from Annida 1 24l02 below 09 Steganoraphy encryption 1 24j30 - 10 Yolov ocr plate number 1 24j31 - 11 List folders of djamal-ag-res 1 24l02 -
- Note: Cont means done partialy, if not conducted todo is preferable.
- Info:
- 00 starts at about 0410. Am 0439 wieder am Tisch nach Morgenbeten und Katzenfütterung setzen.
- 01 ends at about 0458. Link to Google Drive not yet found.
- 02 ends at about 0521 with additional 2 items.
- 03 starts at about 0524 and ends at about 0538.
- 04 ends at about 0558, forgot the start time.
- 05 starts at about 0604 with j-sama, and ends at about 0618.
- 06 an unbestimmter Zeit, etwa 0907 mit
DEEW_Msz4CP
als Geschenk, msg-by. - 07 ends at about 1034. Later continued with progress for Fri 20-Dec-2024.
- 08 starts at about 1129 via WA, ends 1342.
- 11 has not yet archive all info, only initial or current events.
- Others:
- I can not imagine that such a lot of items can be processed, even only for small steps. I just can say, wow! 😉
- It is now 1646 dan ich warte auf die alte mich zum Abholen.
- And for only a to-do list, it is already a two-minutes note. 👍
Tags: