sun 05.01.25
1 min read ·
- Status: 0 (todo), 1 (done), 2 (cont);
Cont means done partialy, if not conducted todo is preferable.id activity status link info 00 This daily note init 1 25a04 below 01 Hugo tips archive 1 25a05 - 02 Hugo intro 1 25a06 ref 03 Hugo sites key features 1 25a07 ref 04 Hugo performance score 1 25a08 ref 05 Static site 1 25a09 ref - Note:
- 00 starts at about 0503.
Tags: