sat 28.12.24
1 min read ·
- Status: 0 (todo), 1 (done), 2 (cont);
Cont means done partialy, if not conducted todo is preferable.id activity status link info 00 Create this daily note 1 24l37 below 01 Fill info for KK-FNB-SD 0 - - 02 Propose two-columns content feature 1 24l35 below
- Info:
- 00 starts at about 0445 nach Morgenbeten und Katzenfütterung.
- 02 ends at about 0449.
Tags: