symbol Link to heading

  • Table

    Symbol
    Meaning
    Refs*
    Accomplished as scheduledNot necessary
    ×Missed from scheduleFuture if continued
    Continued from previous notePast
    Continued to next noteFuture

    * Can be combined in a note

  • The → and ← symbols are still subject to discussion about their position to an item in todo list.

accuracy Link to heading

  • There might be inaccuracy of a date ± 1, since it was archived a couple days after.