md cst level
·
1 min read
15-aug-2025
25g65.06
Sample arrival and request (-2).12-aug-2025
25g65.05
Initial presentation slide for bga.01-aug-2025
25g65.04
Link to data on certain cloud system.25-jul-2025
25g65.03
Initial data in videos and image.01-aug-2025
25g65.02
Files and folders copying to github.23-jul-2025
25g65.01
Intial zoom meeting after tpomi-2025.
notes
- It requires univ-uuk for legality as informed 25h42 .
- It was on v8nfs .
- It is triggered by an activity in 25b11 .
- There are discussion about fluid layers in tank 1 and simulation of the cpo separation process 2.
refs
GPT-4o, “CPO Tank Layering”, ChatGPT, 23 Jul 2025, url https://chatgpt.com/share/6880fd4d-aa30-800a-ab9b-0818070ab727 [20250723]. ↩︎
GPT-4o, “CPO Separation Simulation Methods”, ChatGPT, 23 Jul 2025, url https://chatgpt.com/share/6880fd72-4804-800a-bc7e-f0a8e0b7e480 [20250723]. ↩︎