muhammad farrel fasya alfarizi
·
1 min read
12-aug-202525g37.10Revision of ta-2 via wa comm.12-aug-202525g37.09Copy folders and file from osf to gh.22-jul-202525g37.08Final seminar and comments.21-jul-202525g37.07Presentation file.17-jul-202525g37.06Final seminar date and ta-2 draft.15-jul-202525g37.05Proposal seminar and comments.14-jul-202525g37.04Presentation slide.08-jul-202525g37.03Proposal of bachelor thesis.08-jul-202525g37.02Seminar date confirmation.01-jul-202525g37.01Self introduction and purpose.
notes
- It is on
4rzkp. - Backprogatio neural network for rainfall prediction in Bandung city, under the supervision of Prof. Rizal Kurniadi.
- nginx 500 Internal Server Error on OSF at 2007 on 14-jul-2025, but local files is ready in Ryzen-7
04_presentation_filefolder. Solved at about 2019.