butiran

marco sutisna putra

· 1 min read
  • 17-jun-2025 osfio Thesis i seminar, planned at 1300.
  • 06-jun-2025 8acyd Tesis 1 seminar approval.
  • 03-jun-2025 d5rn9 Further progress and plan change.
  • 28-may-2025 aqmsd Progress and thesis i seminar date.
  • 21-may-2025 pw8g9 A supervion after proposal seminar.
  • 06-may-2025 293hv Proposal seminar bsc-a 3rd floor r3.
  • 05-may-2025 v4ze8 Slide revision and correction list.
  • 02-may-2025 k6nw9 Seminar info from program person.
  • 30-apr-2025 ep3wf Online progress meeting.
  • 29-apr-2025 mka6y Formal supervision, seminar permit.
  • 23-apr-2025 fcd54 Plan for proposal seminar.
  • 17-apr-2025 ba8rw Offline progress discussion.
  • 10-apr-2025 cngw5 Issues for ui; j-rev, model cmp table.
  • 09-apr-2025 gywm6 Offline supervision on proposal.
  • 19-mar-2025 72rhc Sharing of proposal draft v1.
  • 20-feb-2025 5ch4m GitHub repository creation.
  • 19-feb-2025 ngy4q Initial supervision discussion.

notes

  • A GitHub repository is available for discussion through the issues 1.

refs


  1. Marco Sutisna Putra, “Bimbingan Tesis”, GitHub, 19 Feb 2025, url https://github.com/MarcoSutisna/BimbinganTesis [20250501]. ↩︎